Construction started on roughly $10 billion data center in Lebanon, Indiana. Designed for about 1 gigawatt of power. Expected online late 2027 or early 2028. Signals continued "build mode" as AI demand shifts from model demos to industrial-scale infrastructure. The physical buildout continues.